请输入您要查询的字词:
单词
伊朗水电开发
释义
伊朗水电开发
Encyclopedia
工学
〔世界上几个国家水电开发概况〕
释
hydropower development in Iran
伊朗水电开发
伊朗对水力资源发电的开发和利用。伊朗国土面积为164.8万平方千米,全国平均年降水量约为250毫米,水资源总量约为1300亿立方米。伊朗水能资源技术可开发量约为1000亿千瓦·时。伊朗水能资源主要分布在南部的卡伦河(Karun River)上,卡伦河全长840千米,流域面积为6万平方千米。
随便看
layerwise summation method
La Yesca Hydropower Station
laying
laying and insulation of pipe in hot water supply system
laying head
laying-hen housing
laying house
laying method of distribution cable
laying on of hands
layman, laywoman
lay off
lay-off conservation of thermal power equipment
Layout
layout
layout analysis
Layout and laying of drainage pipes
layout and pathway analysis
layout and transportation of concentrators
layout design
layout design of auxiliary pieces in books and periodicals
layout design of the text in books and periodicals
layout design principles for concentrators
layout-designs of integrated circuits
Layout Key for Official Document of Administration
Layout key for Official Documents of Party and Government Organs
科学参考收录了854744条科技类词条,基本涵盖了常见科技类参考文献及英语词汇的翻译,是科学学习和研究的有利工具。
Copyright © 2000-2023 Sciref.net All Rights Reserved
京ICP备2021023879号
更新时间:2026/7/29 20:05:59